Fox Yacht Sales
203 West Cotter Ave
Port Aransas, TX, US, 78373
Tel:(361) 779-8025
Viking CONVERTIBLE - main image

2002 Viking Convertible

location icon Port Aransas, Texas
Year 2002
Length 61 ft
Price
$1,199,000

If you are looking for a 61' that has it all look no further

(2) Seakeeper 6's installed 8/23

Furuno Omni Sonar

Mezzanine with Air Conditioning

New Teak Deck and covering boards

Starboard Engine overhauled 11/22 with currently 2476 hours

(2) New Phasor 21KW generators installed 11/22

Port Engine overhauled 6/25 with currently 351 hours

New Water maker

All Garmin screens at the helm replaced or refurbished 2/26

New Vulkan Couplers on both transmissions

New headliner and upholstery in salon 11/18

New countertops in salon and master head 7/25

All new bedding in 2024

Specifications

Year Built 2002
Category Power
Length Overall 61 ft
Beam 18'2 ft
Construction Fiberglass
Hull ID VKY61548C202
Engines 2
Total Engine Power 2,960 hp
Fuel Tank Cap. 2,000 gal
Water Tank Cap. 310 gal
Holding Tank Cap. 125 gal

Engine 1 Specifications

Make: MTU
Model: 12V2000
Fuel: Diesel
Engine Power: 1,480hp
Engine Hours: 351

Engine 2 Specifications

Make: MTU
Model: 12V2000
Fuel: Diesel
Engine Power: 1,480hp
Engine Hours: 2,476
Electronics

2 Garmin 8617's refurbished in 2026 with GPS/Radar/Bottom Machine

Furuno 8 Omni Sonar

New Garmin 8612 in 2026

Garmin XHD2 Radar

PM411 2KW Chirp Sounder

New Garmin Auto Pilot in 2024

AIS

2 Icom IC-M422 VHF's 

Garmin 8616 Cockpit

Fusion stereo with 4 speakers on the bridge and 4 in the cockpit

Salon

U-Shape sofa recovered 11/18 with storage below

New Headliner and whisper walls 11/18

Electric door

Flatscreen TV

Electrical Panel

Amtico Flooring from salon entry through the galley

Recessed overhead lighting new in '18

Galley

Peninsula Galley with new countertops in 2025

3 sets of Sub Zero under counter refrigerator/freezer drawers

U-Shape dinette recovered 11/18

Teak dinette table

Custom Amtico flooring in the galley

Microwave/Convection Oven

5 burner cook top

Above and below counter storage

Master Stateroom

Queen size bed with storage below

New headliner and overhead lighting in '18

Ceder-lined hanging closet with mirror doors

Reading lights

Samsung Flatscreen TV

Drawer storage

Private entry into the head

New countertops in head in 2025

Headhunter Toilet

Stand up shower

VIP Stateroom-Forward

Double size port lower berth with single starboard berth

Storage below both berths

Hanging locker and drawer storage

Vizio Flatscreen TV

Private access to the forward head

Headhunter toilet

Corian counter top, sink, and vanity

Stand up stall shower

Guest Stateroom

Upper and lower berth with storage below lower berth

Cedar lined hanging closet

Drawer storage

Stacked washer and dryer in aft closet

Private entry into the head

Companionway access to the head

Headhunter toilet

Corian counter top, sink, and vanity

Stand up stall shower

Flybridge

24V LP dredge reels overhead

Miya Epoch CX-15 teaser reels overhead

Pipewelders Tuna Tower

3 Sided curtain enclosure

Quadruple spreader Rupp Riggers

Teak Murray Brothers Helm Chairs

Recessed electronics box overhead

Large freezer in front of the console

Large refrigerated box in front of the console

L-shaped bench seat in front of the console with storage below

Bech seat to starboard with storage below

Aft facing jump seat

6 rod holders on aft bridge rail

Seakeeper controls

Tower with full controls

Cockpit

Murray Brothers Teak Fighting Chair with 4 rod rocket launcher

New Teak deck and covering boards in '22

Cockpit mezzanine with custom air conditioning added '21

Refrigerated drink box in step to the salon

Freezer in port side mezzanine step

Eskimo ice dump under port side mezzanine seat

Quick connect for on deck tuna tube set up

8 rod holders in covering boards

Fresh and Saltwater wash downs

Electric reel plugs under the gunnels

4 JL Audio Speakers

Transom door

Lazarette access

Mechanical and Electrical Equipment

MTU 12V2000 1480HP Engines with 351 hours port and 2476 starboard

Full starboard engine overhaul in 2018

Full port engine overhaul in 2025

(2) 21KW Phasor generators installed in 2018

2167 hours port gen and 2942 starboard gen

2 Seakeeper 6's added 8/23

Oil change system for the mains, gears, and generators

New dual Racor 1000's for main engines '25

1000lb a day Eskimo Ice Machine

Parker Aquamatic water maker new '22

Dual power steering pumps

New master and VIP stateroom AC's '21

Dripless shaft seals

Fuel polishing system

2 Newmar battery chargers

DISCLAIMER

The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.